iLMS知識社群(Sites)師生部落格(Blogs)朝陽首頁(Homepage)登入
位置: 鄭道明 > 職涯檔案 > 個人檔案
個人檔案
學校經歷
工作經歷
專業證照
個人著作
計畫
獲獎榮譽
其他
基本資料
姓名: 鄭道明
系所: 朝陽科技大學 / 建築系 [數位教學紀錄]
研究領域: computer simulation, decision making modeling, construction management
辦公(研究)室: A402
研究室時間: by appointment
聯絡方式: www.cyut.edu.tw/~tmcheng
自我介紹
President
Professor, Department of Construction Engineering
Chaoyang University of Technology
 
Reviewers for Transactions on Evolutionary Computation (IEEE), Transactions on Evolutionary Computation(IEEE), International Journal of Production Economics, Automation in Construction, Simulation Modeling Practice and Theory, Computing in Civil Engineering (ASCE), Journal of the Chinese Institute of Civil and Hydraulic Engineering, Journal of Marine Science and Technology, Built Environment Project and Asset Management, Journal of the Chinese Institute of EngineersJournal of Performance of Constructed Facilities(ASCE), and International Journal of Applied Science and Engineering
學校經歷
1. 普渡大學 / 土木工程系 (博士)
工作經歷
1. 朝陽科技大學 / 校長 (2016-08 ~ 2020-07)
2. 朝陽科技大學 / 副校長 (2012-08 ~ 2016-07, 兼職)
3. 朝陽科技大學 / 教務長 (2008-08 ~ 2014-07, 兼職)
4. 朝陽科技大學 / 理工學院代理院長 (2006-02 ~ 2006-07, 兼職)
5. 朝陽科技大學 / 理工學院副院長 (2006-02 ~ 2008-07, 兼職)
6. 朝陽科技大學 / 營建工程系主任 (2003-08 ~ 2006-07, 兼職)
7. 朝陽科技大學 / 營建工程系專服中心主任 (2000-08 ~ 2003-07, 兼職)
個人著作
期刊論文
1. Lin, D.-J., Yu, W.-D., Wu, C.-M., and Cheng, T.-M., "Correlation between Intellectual Capital and Business Performance of Construction Industry— an Empirical Study in Taiwan," International Journal of Construction Management (EI), DOI: 10.1080/15623599.2017.1315528, May, 2017.
2. Hou, H.-Y., Cheng, T.-M., and Chen, R.-C., "Integrating Education Resources Planning and Practice Information System to Alarm and Redeem Learners’ Performance," International Journal of Information Systems and Change Management (EI), 8(4), 271-283, Oct, 2016.
3. Lin, C.-T., Hsie, M., Hsiao, W.-T., Wu, H.-T., and Cheng, T.-M., "Optimizing the schedule of dispatching earthmoving trucks through genetic algorithms and simulation," Journal of Performance of Constructed Facilities, ASCE, 26(2). (SCI), Apr, 2012.
4. Hsie, M., Hsiao, W.-T., Cheng, T.-M., and Chen, H.-C., "A model used in creating a work-rest schedule for laborers," Automation in Construction, 18(6), 762-769. (SCI, EI), Oct, 2009.
5. Horng, H.-C., Hu, C.-C., and Cheng, T.-M., "Evaluating the effectiveness of FDM in identifying important factors in a dynamic flowshop," Robotics and Computer-Integrated Manufacturing, 25(6), 894-900. (SCI), Aug, 2009.
6. Cheng, T.-M., Yen, R.-C., "Integrating MGA and simulation to optimize the resource utilization," Computer-Aided Civil and Infrastructure Engineering, 24(6), 401-415. (SCI), May, 2009.
7. Cheng, C.-C., Cheng, T.-M., and Chiang, C.-H., "Defect detection of concrete structures using both infrared thermography and elastic waves," Automation in Construction, 18(1), 87-92. (SCI, EI), Jan, 2008.
8. 5. Cheng, T.-M., Chen, Y.-L., "A GA mechanism for optimizing the design of attribute-double-sampling-plan," Automation in Construction, 16(3), 345-353. (SCI, EI), May, 2007.
9. Cheng, T.-M., Chen, Y.-L., "Performing time-cost trade-off anakysis via GA-simulation mechanism," Tamkang Journal of Science and Engineering, 10(4), 307-316. (EI), Jan, 2007.
10. Cheng, T.-M., Feng, C.-W., and Hsu, M.-Y., "An integrated modeling mechanism for optimizing the simulation model of the construction operation," Automation in Construction, 15(3), 327-340. (SCI, EI), May, 2006.
11. Cheng, T.-M., Feng, C.-W., and Chen, Y.-L., "A hybrid mechanism for optimizing construction simulation models," Automation in Construction, 14(1), 85-98. (SCI, EI), Jan, 2005.
12. Feng, C-W., Cheng, T.-M., and Wu, S.-T., "Optimizing the schedule of dispatching RMC trucks through genetic algorithms," Automation in Construction, 13(3), 327-340. (SCI, EI), May, 2004.
13. Cheng, T.-M., and Feng, C.-W., "An effective simulation mechanism for construction operations," Automation in Construction, 12(3), 227-244. (SCI, EI), May, 2003.
國際性會議論文
1. Tao-Ming Cheng, Hsing-yu Hou, Dinesh Agrawal, Rung-Ching Chen, Sung-Chi Hsu, "Improving Students Learning Performance from Learning Engagement," ICOED'2017 (Scopus), Nov, 2017.
2. Chih-Hung Chiang, Keng-Tsang Hsu, Cia-Chi Cheng, Chi-Luen Huang, Tao-Ming Cheng, "Dynamic survey of wind turbine vibrations," SPIE Smart Structures, Mar, 2016.
3. Hsiao, W.-T., Wu, H,-T., Cheng, T.-M., and Tsai, Y., "Mental workloads during form system assembly in environments with various bacjground music," 2014 International Conference on Advances in Management Engineering and Information Technology, Sep, 2014.
4. 1. Hsiao, W.-T., Wu, H.-T., and Cheng, T.-M., Chiang, C.-C., and Chen, Y.-J, "Using thermal image of the face to monitor construction foreman’s performance," Thirteen East Asia-Pacific Conference on Structural Engineering and Construction, Sep, 2013.
5. Hsiao, W.-T., Wu, H.-T., and Cheng, T.-M., and Chang, H.-N., "Using nose tip temperature to monitor crew’s performance," The First Australia and South East Asia Conference in Structural Engineering and Construction, Nov, 2012.
6. Hsiao, W.-T., Wu, H.-T., and Cheng, T.-M., "A Study on Crew Performance Measurement by Using Heart Rate and Oxygen Consumption," Construction Research Congress 2012, May, 2012.
7. Wu, H.-T., Hsiao, W.-T., Lin, C.-T., and Cheng, T.-M., "Application of genetic algorithm to the development of artificial intelligence module system," The 2nd International Conference on Intelligent Control and Information Processing, (EI), Jul, 2011.
8. Hsiao, W.-T., Lin, C.-T., Wu, H.-T., and Cheng, T.-M., "A hybrid optimization mechanism used to generate truck fleet to perform earthmoving operations," Geotechnical International Conference II, (EI), Jun, 2011.
9. Lin, C.-T., Hsiao, W.-T., Cheng, T.-M., and Wu, H.-T., "Simulation of NATM tunneling construction in gravel formation—lessons learned from Pakuashan highway tunnel project in Taiwan," Geotechnical International Conference I, (EI), Aug, 2009.
10. Hsiao, W.-T. and Cheng, T.-M., "A model of generating kob rotation schedule for construction workers," The 12th International Conference on Computing in Civil and Building Engineering, Oct, 2008.
11. Horng, C.-H., Hu, C.-C., and Cheng, T.-M., "“Evaluating the effectiveness of FDM in identifying important factors in a dynamic flowshop," The 18th International Conference on Flexible Automation and Intelligent Manufacturing, Jun, 2008.
12. Cheng, T.-M., and Chen, Y.-L., "A genetic algorithm simulation mechanism for time-cost trade-off analysis," The Fifth International Conference on Engineering Computational Technology, Sep, 2006.
13. Cheng, T.-M., and Chen, Y.-L., "Construction simulation using fuzzy durations," The Fifth International Conference on Engineering Computational Technology, Sep, 2006.
14. Cheng, T.-M., and Chen, Y.-L., "Optimization the design of an attribute double sampling plan," The 10th International Conference on Civil, Structural and Environmental Engineering Computing, Aug, 2005.
15. Cheng, T.-M., Hsu, M.Y., Chen, P. C., and Lin, C. C., "Automatic design mechanism for resource distribution for construction operations simulation," The 21st International Symposium on Automation and Robotics in Construction, Sep, 2004.